Projects
Advanced Construction Technologies
Advisory Services for Exploring Innovative Construction Technologies for Pond Filling Works in San Tin Technopole
Commissioned By:
Project Overview:
The proposed site formation of San Tin Technopole (STT) would need to tackle with soft deposits at existing fishponds of about 90 ha. To speed up the pond filling works in a cost-effective manner, the CEDD has commissioned The Building Technology Research Institute (BTRi) to explore innovative construction technologies that satisfy the project's strict requirements for design, environments and timeline. The innovative construction applications, for monitoring the site formation works during construction stage, would also be incorporated into the STT’s digital twin platform.
Key Achievement:
1. To explore innovative construction method / technologies for speeding up the site formation works.
2. explore innovative construction applications for monitoring the site formation works and advise on the strategy, plan and scheme for the integration of the applications to the digital twin platform.
Related Projects
Strategic Study on AI Applications in Construction
Feasibility Study on the Integration of High-Quality, Cost-Effective E&M Materials and Equipment in Hospital Development
Development and Implementation of Blockchain-based E-Inspection System for Light Public Housing